Skip to content
KisanPe
Government Schemes

Mukhyamantri Solar Pump Yojana Maharashtra: Eligibility, Subsidy and Online Apply

21 November 202611 min read

Key takeaways

  • Mukhyamantri Solar Pump Yojana (now integrated with PM KUSUM and Magel Tyala Solar Pump) provides subsidized solar agriculture pumps in Maharashtra.
  • Small and marginal farmers (General category) pay only 10 percent of pump cost (90% subsidy), while SC/ST farmers pay only 5 percent (95% subsidy).
  • Farmers with land up to 2.5 acres qualify for 3 HP DC solar pumps, while land between 2.5 and 5 acres qualifies for 5 HP systems.
  • Replaces erratic nighttime grid power with dependable daytime irrigation, saving costly diesel generator expenditure.
  • Implemented by Maharashtra State Electricity Distribution Company Limited (MSEDCL/Mahadiscom) through an online digital portal.

For decades, farmers across Maharashtra faced severe irrigation hurdles due to erratic three-phase agricultural electricity supplied predominantly during late-night hours. Nighttime irrigation exposed cultivators to dangerous snakebites, electric shocks, and severe sleep deprivation. To resolve this, the Government of Maharashtra launched the Mukhyamantri Solar Pump Yojana - now expanded through the historic 'Magel Tyala Solar Pump' (Solar Pump on Demand) mission and PM-KUSUM Component B. This initiative provides up to 95 percent subsidized off-grid solar agricultural pumps for daytime watering.

Scheme overview and recent Magel Tyala expansion

Administered by the Maharashtra State Electricity Distribution Company Limited (MSEDCL/Mahadiscom):

  • Target beneficiaries: Farmers holding agricultural land with an assured water source (borewell, open well, farm pond, or river) who do not possess a conventional grid power connection, or whose grid applications are stuck in the paid-pending backlog.
  • Daytime irrigation: Solar PV panels power the pump continuously from 8:00 AM to 5:00 PM, eliminating nighttime farm visits entirely.
  • Zero recurring electric bills: Because the system operates entirely off-grid using solar energy, farmers incur zero recurring monthly electricity bills or diesel fuel costs.

Subsidy structure and farmer contribution breakdown

The scheme offers unmatched subsidy support funded jointly by central and state governments:

  • General category farmers: 90 percent total subsidy (Central PM-KUSUM 30% + Maharashtra State Government 60%). The farmer contributes only 10 percent of the benchmark cost.
  • SC and ST category farmers: 95 percent total subsidy (farmer contributes just 5 percent of the system cost).
  • Pump sizing by land area: Farmers holding up to 2.5 acres are eligible for a 3 HP solar pump; landholdings between 2.5 and 5.0 acres qualify for a 5 HP pump; landholdings above 5.0 acres qualify for a 7.5 HP pump system.

Step-by-step online application process on Mahadiscom

Applications are submitted 100 percent online without middleman involvement:

  • Step 1 - Portal registration: Visit the official Mahadiscom solar portal (kusum.mahadiscom.in or agsolar.mahadiscom.in) and select 'Apply for Solar Pump'.
  • Step 2 - Land and water details: Enter your 7/12 land extract survey number, 8A landholding record, water source type (open dug well, borewell, or river), and pump head depth.
  • Step 3 - Document upload: Upload scanned copies of 7/12 extract with water source recorded, Aadhaar card, caste certificate (if claiming SC/ST subsidy), bank passbook, and passport photo.
  • Step 4 - Site survey: MSEDCL field engineers conduct a GPS-tagged mobile survey to verify the water source and shadow-free solar space.
  • Step 5 - Demand note and payment: Once approved, a Demand Note is generated online. Pay the 5% or 10% farmer share via net banking, UPI, or CSC centre.
  • Step 6 - Empanelled vendor installation: An authorized vendor delivers and installs the solar panels, DC/AC submersible pump, and MPPT controller within 30 to 60 days.

Technical specifications, warranty and system maintenance

All installed systems comply with strict Ministry of New and Renewable Energy (MNRE) benchmarks. Solar PV modules come with a 25-year performance warranty (minimum 80% output at year 25), while the pump, motor, and MPPT solar controller carry a 5-year comprehensive on-site replacement warranty. Farmers are advised to clean dust from solar panel surfaces with fresh water once every 7 to 10 days to maintain peak electrical generation and maximum water discharge.

Frequently asked questions

What is Mukhyamantri Solar Pump Yojana in Maharashtra?
A state initiative providing 90 to 95 percent subsidized off-grid solar agricultural pumps to farmers for daytime irrigation.
Who implements the solar pump scheme in Maharashtra?
MSEDCL / Mahadiscom (Maharashtra State Electricity Distribution Company Limited).
What is the farmer share / beneficiary contribution?
General category farmers pay only 10% of the total cost; SC and ST farmers pay just 5% of the total system cost.
Who is eligible for a 3 HP solar pump?
Farmers holding up to 2.5 acres of agricultural land with an assured water source like an open well or borewell.
Who is eligible for a 5 HP or 7.5 HP solar pump?
Farmers with 2.5 to 5.0 acres are eligible for 5 HP; farmers owning more than 5.0 acres qualify for a 7.5 HP solar pump.
Can farmers with an existing grid electricity pump apply?
Priority is given to off-grid farmers without grid power or those on the MSEDCL paid-pending connection waitlist.
What documents are required for online application on Mahadiscom?
Recent 7/12 extract, 8A land extract, Aadhaar card, bank passbook copy, caste certificate (for SC/ST), and water source certificate.
How does the online application process work?
Apply on the Mahadiscom solar portal, undergo mobile site survey, pay the demand note share online, and the empanelled vendor installs the pump.
How long does installation take after making payment?
Typically 30 to 60 days following successful payment and site clearance by the selected vendor.
What is the warranty period for the solar pump and panels?
Solar panels carry a 25-year performance warranty; the pump, motor, and controller have a 5-year comprehensive free maintenance warranty.
What are the benefits of daytime solar irrigation?
Provides reliable irrigation between 8:00 AM and 5:00 PM, avoiding night-time farm visits and hazard of snakebites or electrical shocks.
What is the Magel Tyala Solar Pump scheme in Maharashtra?
The expanded mission guaranteeing a solar agriculture pump to every eligible Maharashtra farmer who applies and has an assured water source.
How can a farmer check beneficiary application status?
Log into the official Mahadiscom solar portal using Beneficiary ID or Application Number to track survey and installation progress.
What maintenance is needed for a solar pump system?
Washing the solar panels with clean water once a week to remove dust and keeping vegetation trimmed around the array.
Can a solar pump be connected to drip irrigation?
Yes, solar pumps connect directly to drip and sprinkler systems, providing optimal pressure for water-efficient irrigation.

This article is for general information only and is not financial advice. Loan and scheme eligibility depends on partner and government criteria.

Get the KisanPe app

Loans, schemes and crop intelligence — free to start, in your language.

Keep reading

Explore loans and schemes on KisanPe

Download the app and put what you’ve learned into action.

Download KisanPe App